This post contains pictures for the week ending October 20th, 2013.  The under slab utilities are going in.  This includes water supply lines, and drain lines for the sinks, toilets, and floor sinks, as well as the under slab HVAC ducting.  Some under slab electrical has been placed, the floor boxes themselves will be completed when the interior of the foundation is back filled.  The conduits for the floor boxes are being placed.  Waterproofing of the foundation has been completed and back filling of the foundation is taking place.

[flickrset id=”72157636699677044″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]