This post contains pictures for the week ending April 20th, 2014.  The roof drains are being cut into the roof, plumbing supply and waste lines are being run.  Pick up framing is ongoing.  Pictures of the mock up are in this post as well.

[flickrset id=”72157644223332725″ thumbnail=”small” photos=”” overlay=”true” size=”large”]