This post contains pictures for the week ending October 25th, 2013.  Under slab utilities are wrapping up, site retaining walls footings are being dug.  The floor sink for the mechanical room is in place.  This floor sink will act as the drain for the fire sprinkler annual testing as well as the drain for the entire mechanical room.