This post contains pictures for the week ending November 17th, 2013.  The underslab utilities have been placed.  This includes the electrical, radiant heating, and plumbing.   The concrete slab has been poured, it is currently covered with blankets and we will have pictures for next week.  The garage floor drains have been installed.  The rockery wall in the driveway has been installed as well.

[flickrset id=”72157637700038666″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]