This post contains pictures for the week ending November 24th, 2013.  The rear retaining wall footings have been poured, and the vertical section of the walls are being formed.  We got a little bit of snow this week, but we were still able to pour the garage slab.  You can see the visible vapor from the cold weather and moisture from the concrete!  The concrete slabs that were poured in place last week have been uncovered as well.

[flickrset id=”72157637952510215″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]