This post contains pictures for the week ending December 15th, 2013.  The steel is being welding in place, all the connections are being inspected and made permanent.  Currently, a little over half the connections have been finalized.  The curved retaining walls have had their forms stripped.  The bedroom wing upper floor joists are in progress and about 3/4 complete.  The next stage after all the joists are in place will be to sheath the floor.

[flickrset id=”72157638621941704″ thumbnail=”small” photos=”” overlay=”true” size=”large”]