This post contains pictures for week ending July 28th, 2013.   Utility trenching and installation is underway.  The sewer line has been installed to the house footprint, and the trench has been backfilled.  Trenching for the water and power is underway.

[flickrset id=”72157634806050528″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]