The emphasis this week is on building the driveway.  First it is excavated, then filled with dirt and then rock, and then compacted.  The driveway will then be ready to receive the first lift of asphalt.  The footings are also being waterproofed with felt and then the front loader is coming through and backfilling the footing excavation.  The footings are complete and ready for the concrete on the lower media room area.