This post contains pictures for the week ending June 1, 2014.  The emphasis this week has been on excavation and the placement of utility pipes (electric, sewage, water, etc.) into the trenches.  The water line connection to the public utility is pictured with blue tracer lines (these allow for future detection).  The Utility trenches are backfilled with sand (to protect pipes) and then compacted.