The excavation crew is on site back filling the concrete work and bringing the site to the grade elevations specified by the plans.  Inside the concrete stem walls the concrete crew is bringing in fill and compacting to prepare for the concrete slab that will be the future floor for the Media and Bunk Rooms.  The driveway is also being prepared to receive the first lift of asphalt.