This post contains pictures for the week ending Sunday January 25, 2015.  As the stucco preparation is moving forward the yellow Densglass (a gypsum product) is visible preparation for the roof eave/ soffits.  Scaffolding is being erected for the stucco application. Meanwhile sheetrock and tile backerboard is being applied inside, bringing true dimension to the interior.