This post contains pictures for the week ending December 14, 2014.  Work continues despite the recent storm, with the standing seam metal roof being the emphasis.  Most surfaces have now been covered and the trim pieces remain.  Meanwhile inside, the electrical work continues with the Audio Video pre-wire being performed, and plumbing work ongoing.