This post contains pictures for the week ending February 1, 2015.  The jobsite exterior is defined by plastic sheeting designed to keep the stucco from getting all over the site.  The stucco “scratch coat” is visible here and is the first of 3 coats of stucco and it adheres to the lathe.  Also in progress is the sheetrock installation.  The Tile backer board (concrete) is place where tile where be installed.