This post contains pictures for the week ending August 3, 2014.  The framing package has arrived along with some rain.  The garage beams and pony walls have been framed,  along with some of the ground floor walls.  The Sill Plates are being set and bolted to the anchor bolts atop the concrete stemwalls.  The framing is underway!