This post contains pictures week ending 3.1.15.  Progress is being made presently on the exterior window and siding trim.  The stucco craftsmen are ensuring that the stucco is flawless.  Meanwhile in the interior, the door package is being installed, and the showers are being prepared for tile with mortar beds.  The cabinets are being installed this week as well.