This post contains pictures for the week ending June 8, 2014.  The utility trenches are dug and laying of the water and fire suppression lines are depicted and identified by the use of copper near the home.  Once the lines are tested and inspected they are backfilled with sand to protect the.  The Grey pipe is conduit for electrical line  and the thin blue wires are tracer wires for pipe detection in the future.  The foundation crew has arrived and are using a laser to derive elevations, and setting stakes and rebar for the home’s concrete footings.  Spread footing are depicted with rebar mats to strengthen the concrete.