This post contains pictures for week ending September 7th, 2014.  The utility trenching excavation and rock removal continues.  Conduits have been placed for the electric service, and sleaving installed for the gas.  The sewer pump tank has been placed, and sewer line connected at the street.  The trench backfill is in progress.