This post contains pictures from the week ending April 10, 2016.  Here are several more pictures showing the progress of the Wood floor installation and finish.  Robert has taken pictures showing the Slab and Tile Installation with their finished look.  The guest loft desk has been removed to shorten the width per Trish’s request.  Work on the Great Room Glazing design is in full swing with the shoring of the Ridge beam shown.