This post contains pictures from the week ending August 16, 2015. Rake windows above the Weiland doors have been installed.  Exterior pictures show the completed concrete work for the AC/Generator locations.  Roofing pictures of the completed standing seam metal roof.  Interior pictures of the completed insulation process.  Interior pictures of the drywall being stocked as well as being installed.  Several areas are being prepped for the installation of the stone veneer on the exterior of the house.