This post contains pictures from the week ending December 13, 2015. Casework for the installed doors is ongoing.  The fitting of the window stools is in motion.  Cabinetry installation is coming along with several pictures showing the installation throughout the house.  Placement of the Bathroom tile is developing throughout the house as well.  The finishing of the drywall for the reframe to add the interior glass at the Guest Loft is almost complete with the completed side be cased out with trim.  Everyone please have a wonderful weekend.