This post contains pictures from the week ending March 13, 2016. There are several pictures showing the finish of the wood flooring along with the protection that has been added. Pictures of the completed Interior stain work throughout the house.  Installation of the Isokern Fireplace unit is complete and awaiting the installation of the Insert.  Installation of the slab countertops in several locations.  Mockup of the proposed design change in the Great Room. Everyone please have a great weekend.