This post contains pictures for week ending July 28th, 2013.  The vapor barrier and rebar has been installed for the slab installations, and the stemwalls have been sprayed with insulation. The floor joist installation has been completed, and the underfloor plumbing supply and waste lines, and HVAC ductwork installation is underway.