This post contains pictures for week ending August 18th, 2013.  The structural framing has progressed dramatically, with the bedroom wing framed to the second story roof.  Living room steel has been set.

[flickrset id=”72157635104455010″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]