This post contains pictures for week ending October 14th, 2012.  The structural framing is underway, with exterior wall framing and sheating in place.  The gas line has been run to the structure.

[flickrset id=”72157631752693809″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]