This post contains pictures for week ending October 7th, 2012.  The infiltration trench adjacent to the driveway has been cut and lined with filter fabric to accept the gravel gallery.  The patio retaining walls have been stripped and backfilled, and the prep fill for inside the patio has been placed and compacted.  The floor sheathing has been placed, and the wall plates are being marked out.