This post contains pictures for week ending November 11th, 2012.  The garage roof has been framed and sheathed.  The posts and outlookers for the entry have been set.  We have begun rolling joists for the second floor.

[flickrset id=”72157631968689512″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]