This post contains pictures for week ending December 2nd, 2012.  The structural framing continues to progress.  Roof framing and sheathing are in progress at the lower level, and second level walls are being framed.  The stairs to the second level are being framed and installed.

[flickrset id=”72157632135297789″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]