This post contains pictures for week ending February 24th, 2013.  The asphalt shingles and metal standing seam roofing are being installed.  The soffit wood is being cut and installed over the WUI required sheetrock at the exterior.  Electrical wiring, HVAC ductwork, fire sprinklers, and plumbing piping are all being roughed-in.