This post contains pictures for week ending March 10th, 2013.  Winter weather returned to the Tahoe area this week, slowing the exterior progress.  The exterior door and window trim is in progress, and the metal transitions are being placed for siding and masonry installation.  The hydronic tubing is being installed at the interior.  Pocket door frames have been installed in the framing.