This post contains pictures for week ending March 17th, 2013.  The wood siding installation is underway at the exterior.  The paper and wire prep for the masonry veneer has been placed, and is awaiting inspection.  Insulation is underway at the interior, with the closed-cell spray foam completed at the ceilings, and BATT insulation underway to complete the assembly.  The fireplace has been delivered and installed.

[flickrset id=”72157632994229499″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]