This post contains pictures for week ending March 24th, 2013.  The siding installation is well underway at the exterior, with the majority of the first level covered; our progress was slowed by a midweek winter storm.  The insulation has been completed at the interior ceiling and walls, and sheetrock installation is underway.

[flickrset id=”72157633058251791″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]