This post contains pictures for week ending June 2nd, 2013.  Masonry work continues at the entry and living room side of the fireplace chimney.  The casing trim is being installed at the windows on the lower level, and the upper level trim has the final coat of finish.  Slab installation at the bathrooms is underway.  The gas line and electrical outlets have been run for the patio firepits and walls.

[flickrset id=”72157633832908967″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]