This post contains pictures for week ending June 30th, 2013.  The masonry veneer for the chimney is underway on the roof.  Stone slab flooring installation is underway at the entry.  Wood flooring installation continues on the main level.  Shower glass fixed panels are being installed in the bathrooms.  The metal guardrail inserts have been installed at the decks.  Light fixture installation is underway.