This post contains pictures for week ending September 30th, 2012.  The first lift of driveway asphalt was placed at the end of last week.  Currently, the concrete forms and rebar are being installed at the rear patio retaining walls and footings.

[flickrset id=”72157631643406667″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]