This post contains pictures for week ending September 9th, 2012.  The foundation has been wrapped in waterproofing, and the drainage pipe at the perimeter is being backfilled.  The sill-plates are being set at the foundation walls and piers, and the hardware being hung for the floor joists.

[flickrset id=”72157631456226154″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]