This post contains photos of the week ending September 29th, 2013. We prepared the electrical in the pavilion slab area, and poured the garage and service slabs. The new concrete samples were prepared for color review, as were the new exterior stain samples. The framers started back in on the site and began to sheet the floor to prepare for the lower story concrete floor.  They will begin framing the garage this week (9-30-13 > 10-4-13).

[flickrset id=”72157635958012816″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]