This post contains pictures from the week ending August 14, 2016.

We see sheetrock boards in place in the switchboard room. Some pictures and videos show the gypcrete prep going on in the radiant floor area at the lower level. Upper level roofing is proceeding. Concrete is being poured for the revised backyard area retaining walls. In the interior, we can see shade boxes being installed in the upper level”