This post contains pictures from the week ending August 21, 2016.

We see progression on the exterior sitework; revised backyard retaining walls are being  formed and concrete poured.  Some pictures show the forming of exterior site stair at the north west terrace area. Upper level roofing is progressing, roof drains and insulation being installed can be seen.  Interior mechanical, electrical and fire sprinkler rough in elements for  Phases 1,2 and 3 of the project can be seen in several pictures. Spray foam insulation is being carried out. At the exterior revised mock-up, metal siding had been installed. Pictures also show the installed exterior switchboard, Also, samples of materials from the ARC approved material list can be seen in pictures.”