This post contains pictures from the week ending August 7, 2016. We are moving forward on window installation. Clerestory windows are up. Window transoms at the entry have been framed. We can see shade boxes installed. Excavator’s work has started for the revised backyard concrete sections.  Forms on the concrete walls above the roof at the living/dining fireplace have been stripped. We can see concrete placement happening at the North East end high roof end chimney concrete walls. Some photos and a video show the pumping truck that we used for pumping concrete to the final placement location.  Roofing is complete at the lower level. Pictures show the progress on the roofing. Foam board insulation has been moved onto the high roof for installation.  Radiant floor heating coils are being installed at the lower level.