This post contains pictures from the week ending July 31, 2016.

The roof installation is continuing, as well as the siding installation. Both are coming along nicely. Drywall tape + Texture continues, with the Garage being finished up right now so that we can prepare to primer and paint right after the garage door are installed. The Steel doors for the garage have been ordered (Mechanical room and both garbage room doors), as well as the Electrical meter room double doors. Landscaping boulders are installed, and the grading and irrigation system continue.