This post contains pictures from the week ending May 7, 2017.

Meg, Stu and Family, this week we have pictures for the interior doors, shower pans, and roofing.

Interior door installation continues with a few pictures showing the pocket door assemblies be placed.

Waterproofing of the shower pans started this week.  Kurt will call for a shower pan inspection on three of them – West, North and Bunk baths – next week.  The Master will be inspected the following week.

The Metal Roof installation is ongoing at the upper level of the house.

Have a wonderful weekend.