This post contains pictures from the week ending July 24, 2016.

We have had a wonderful week with beautiful sunny weather!  Excavation has begun and is ongoing.  We have chalked out for the footings and digging has begun for the subgrade utilities and footings.  There are also a few pictures showing the utility lines and drainage lines that are placed in the trenching to the house.  The sewer ejector pump has been set in place and perimeter french drains have been installed at the lower sub grade.