This post contains pictures from the week ending October 23, 2016.

The 1st lift of the driveway has been done.  The footings were covered in anticipation of the storm.  The radiant tubing was installed on the lower level and the slab is being poured.  Soil stabilization will continue through the winter.

Have a wonderful weekend!