This post contains pictures from the week ending October 30, 2016.

The footings and piers are being poured and the lower level slab has been poured.  Framing has begun and the steel is being installed at the lower level.  The radiant heating manifolds can be seen protruding from the slab in the lower level.  We are expecting cold and wet conditions this weekend and have prepared the job site accordingly.