This post contains pictures from the week ending October 9, 2016.

The lower level footings have been marked out and are being dug.  Underground utility piping is being laid into place.  Concrete blankets are visible and the retaining walls continue to be backfilled.  The electrical trench has been dug and conduit has been installed.  The lower level has been sprayed with insulation.

Have a wonderful weekend!