This post contains pictures from the week ending March 12, 2017.

The Site meeting was a success. Finishing touches are being made by electricians based on the filed approved notes. Insulation is being installed and Sheet Rock is scheduled to be stocked on or just after March 17th. Phase 1 Cabinet shop drawings will receive finishing touches based on IE/Design changes discussed during 03.08.17 Site meeting. Interior Door Vendor will be selected soon so that we can begin to develop final Door drawings.