This post contains pictures from the week ending September 4, 2016.

Interior framing continues. The pool + Spa are formed and we are coordinating the plumbing (to Outdoor Storage room). The roof is dried-in. Garage has drains in place, preparing for slab pour. The Sierra Pacific windows (order #1) have arrived.