The post contains pictures for the week ending May 30, 2014.  The excavator is making headway with the utility trenching.  Trenches for electricity, sewage, water, gas, cable, and telephone are dug.  Pipe or cable is ran to locations from the tie-ins at the road to destinations at the building.  The black line with the copper fitting is the domestic water tie-in.  Our excavator is working on a copper line that ties water in to the house.  We were also pleased with the hard work that went into the first lift (of two) for the driveway as it meanders towards the building site.