This post contains pictures for the week ending June 22, 2014.  As the Rhodes and RGA/Crestwood team were on site today, we all got a good look at the excavation proceedings and the prospective landscaping.  The underground utilities and drainage system for this project is extensive.  The large concrete basins being placed are called drop inlets with familiar looking steel gratings.  This is where water is stored as it awaits to be drained into the infiltration drains.  The small round concrete basins are cleanouts for the drop inlets. The white pipes sticking out are the drainage pipes for sewage, and roof drains, while the grey pipe is electric and gas utility sleeves. The yellow infiltration basins are being installed as well.  The management team is also assembled today to ensure optimal design success!