This post contains pictures for the week ending June 8, 2014.  This expansive photo set depicts the excavation work advancement.  Some utility trenches are being backfilled  by hand to preserve the native landscape while others are still under construction.   The electrical conduit is being ran to house future cable and the temporary power box has been inspected and will be activated soon.  The excavator is straining soil for placement in the three landscape mounds while the skid steer and mini excavator are sculpting the mounds to Martis Camp specifications. The waste water lines are being laid out and dug beneath the home footprint in preparation for the underslab utilities.